Blue Rock completes 358,000 s/f distribution project for First Industrial in Claymont, DE
- MAREJ
- 21 hours ago
- 2 min read
Five-month fast-track fit-out follows ground-up delivery

Claymont, DE — Blue Rock announced the completion of both the ground-up construction and the comprehensive fit-out of a 358,000 s/f distribution facility at First State Crossing in Claymont.
This project represents another strong chapter in Blue Rock’s ongoing partnership with First Industrial Realty Trust, a leading owner, operator, and developer of logistics real estate.
Complete Delivery
Blue Rock delivered the rear-load warehouse as part of the broader First State Crossing redevelopment, a transformative 420-acre project turning a former steel mill site into a modern industrial and commercial hub.
The facility features:
• 40-foot clear height
• 68 dock positions, two ramp doors, and 241 trailer parking stalls
• Strategic proximity to I-95, I-495, and Philadelphia International Airport
Following completion of the building, Blue Rock was selected to provide a full interior fit-out tailored to the operational needs of First Industrial Realty Trust’s tenant, ensuring the facility was fully prepared for occupancy and performance.

Fast-Tracked Fit-Out
Originally scheduled as an eight-month effort, the fit-out was successfully completed on an accelerated five-month timeline.
Blue Rock worked closely with the tenant and ownership team to meet the revised schedule while maintaining the highest standards of quality and functionality.
The fit-out scope included:
• A new 12,000 s/f office
• An 11,000 s/f maintenance shop
• Renovations to an existing 5,000 s/f office
• Infrastructure upgrades such as battery-charging stations, high-volume, low-speed fans, and modified dock equipment for larger levelers
• Site improvements, including perimeter fencing, a guard shack, and updated building signage
Longstanding Partnership
Blue Rock values its partnership with First Industrial Realty Trust, having teamed together on multiple projects totaling nearly 4 million s/f in the NE. Recent projects include:
First Park New Castle – Building B, a 225,680 s/f facility currently under construction
First Logistics Center @ 283, Londonderry Twp., PA – (2) buildings totaling 1,783,800 s/f
First I-78/81 Logistics Center, Jonestown, PA – (2) buildings totaling 988,920 s/f
First 33 Commerce Center, Northampton County, PA – (2) buildings totaling 584,000 s/f
First Park @ Central Crossing – Building III, Bordentown, NJ – 119,800 s/f
First Bordentown Logistics Center, Rising Sun Road, Bordentown, NJ – 208,000 s/f




